Riley Road Renovation

September 4, 2010

Posted by Kelly Andrews on September 8, 2010 at 9:49 AM

All of the framing is complete in the basement and upstairs.  The existing roofing has been removed and we are ready to install the new ice shield and shingles.  The old gutters and downspouts have been removed .  All new electric has been run in the basement with lots of recessed lighting to make the basement bright and inviting.  The electrical upstairs has been re-worked to accomodate current electrical codes.  Gravel has been put on the front driveway to make the house more accessible.  All of the "scrap" metal has been recycled.  The custom made windows are on order and should be arriving very soon! 

        

Categories: None

Post a Comment

Oops!

Oops, you forgot something.

Oops!

The words you entered did not match the given text. Please try again.

Already a member? Sign In

217 Comments

Reply andrea rexrode
1:36 PM on September 15, 2010 
You've done a fantastic job with this! The lower level is open and super useable. Careful planning upstairs has yielded a nice additional bedroom. Kudos to you & your team!